Able machine was outgrowing there existing facility and in need of additional office and training space, a larger manufacturing/ showroom with a tall ceiling height and a mezzanine for future 2nd floor expansion.

Design/Build

  • Ground up new construction
  • Developed project specifications and plans

Construction of a 15,000 SF Butler Building including the following:

  • Site Work
  • Foundation
  • Steel Erection
  • Exterior Split Face Block
  • Turnkey pre-engineered building by Butler Manufacturing
  • Polished concrete
  • Storefront Glass
  • HVAC
  • Plumbing
  • Electrical
  • 3,750 SF of office space with mezzanine above
  • 11,250 SF of manufacturing space/ showroom
Location: Agawam, Massachusetts
Engineering: Full Design Build Services
Market Sector: Industrial
Year started: 2018
Duration: 6 months