The Dumont Company
Industrial
Design/Build Engineering and Permitting
- Site Plan Approval submitted in September/ approved in October
- Building permit acquired 1 week after site plan approval
Construction of a 24,000 SF Butler Building including the following:
- Site Work
- Foundation
- Steel Erection
- Exterior Split Face Block
- Exterior Insulated Metal Wall Panels
- Butler MR-24 Roof
- Epoxy Flooring
- Storefront Glass
- HVAC
- Plumbing
- Electrical
3,500 SF of Office Space with a 3,500 SF Storage Mezzanine Above.
Location: Deerfield, MA
Engineering: Full Design Build Services
Market Sector: Industrial
Year started: 2018
Duration: 6 months