Construction of a mezzanine for an electrical control room.  The construction complied with UL requirements for a 2 hour fire rated enclosure. The room was built with 14 gauge load bearing structural studs with double 5/8 type x drywall. The ceiling consisted of 16 gauge structural channels with double 5/8” type x sheetrock and a 2” concrete roof.

  • Building Addition
  • Design-Build
  • Electrical Construction
  • Fire Alarm
  • HVAC
  • Lighting Project
  • Power Distribution Upgrade
  • Renovation
Location: Newington, New Hampshire
Engineering: One Development & Construction/Casco Bay Engineering
Market Sector: Industrial
Year started: 2020
Duration: 4 Months