Design, Build, Permitting and Construction of 7400 SF Airport Hanger

  • Engineering for Site Design, Architectural Design, and Structural Design.
  • Construction Management
  • Construction of a 7400 SF Airport Hanger
Location: Northampton, MA
Engineering: Design/Build
Market Sector: Infrastructure
Year started: 2018
Duration: 4 months