Renovation of Existing Shipping and Receiving, Break Room, Locker Rooms, and Bathrooms.

  • Set up containment around project with negative air to prevent disturbance to production.
  • Shore and Demo existing load bearing masonry walls for expansion of existing spaces.
  • Foundation
  • New masonry walls.
  • New structural steel mezzanine.
  • Epoxy Flooring, LVT Flooring, and Carpet Tile.
  • Storefront Glass
  • Millwork
  • HVAC incorporated into existing BIM System.
  • Plumbing
  • Electrical
Location: Whately, MA
Engineering: Hill Engineers, Architects, and Planners. 50 Depot St, Dalton, MA.
Market Sector: Industrial
Year started: 2019
Duration: 4.5 months. Earned Early Completion Bonus for finishing before scheduled completion.