A SportClips franchise partner wanted to open another location in Hadley, MA.

Retail Build-out

  • Permitting, Controlled Construction, General Contracting and Project Management
  • Interior build out to meet all SportClips Specifications

Interior Construction of a 1,100 SF haircutting salon including the following :

  • Demolition of existing interior walls
  • Concrete slab cutting and infills for underground plumbing
  • Interior steel stud framing, drywall and painting
  • Acoustical ceilings
  • Heat welded, sport court flooring
  • Installation of all SportClips millwork, tv’s, mirrors, stadium lighting, hair wash stations, wall art, signage and central vacuum system.
  • HVAC
  • Plumbing
  • Electrical
Location: Hadley, MA
Engineering: Controlled Construction, Spec-build project
Market Sector: Retail/Service
Year started: 2020
Duration: 8 weeks