Agawam, Massachusetts
Able Machine

  Project Details

Able Machine

Able Machine was outgrowing their existing facility and in need of additional office and training space.

Location Agawam, MA
Client Able Machine
General Contractor ONE Development
Duration 6 Months
Size 15,000 SF

Project Summary

Able machine was outgrowing there existing facility and in need of additional office and training space, a larger manufacturing/ showroom with a tall ceiling height and a mezzanine for future 2nd floor expansion.

Sectors

Sectors

Offices

Offices

Westfield, Ma

Services

Services

Engineering

Building
Information
Modeling

Project Facts

Construction of a 15,000SF Butler Building including the following:

  • Site Work
  • Foundation
  • Steel Erection
  • Exterior Split Face Block
  • Turnkey pre-engineered building by Butler Manufacturing
  • Polished concrete
  • Storefront Glass
  • HVAC
  • Plumbing
  • Electrical
  • 3,750 SF of office space with mezzanine above
  • 11,250 SF of manufacturing space/ showroom

Go back

Similar Projects All Projects