Project Details
Able Machine
Able Machine was outgrowing their existing facility and in need of additional office and training space.
| Location | Agawam, MA |
| Client | Able Machine |
| General Contractor | ONE Development |
| Duration | 6 Months |
| Size | 15,000 SF |
Project Facts
Construction of a 15,000SF Butler Building including the following:
- Site Work
- Foundation
- Steel Erection
- Exterior Split Face Block
- Turnkey pre-engineered building by Butler Manufacturing
- Polished concrete
- Storefront Glass
- HVAC
- Plumbing
- Electrical
- 3,750 SF of office space with mezzanine above
- 11,250 SF of manufacturing space/ showroom