Project Details
Gyptech-Georgia Pacific Electrical Mezzanine
Construction of a mezzanine for an electrical control room.
Location | Newington, NH |
Client | Georgia Pacific |
General Contractor | ONE Development |
Duration | 4 Months |
Project Summary
Construction of a mezzanine for an electrical control room. The construction complied with UL requirements for a 2 hour fire rated enclosure. The room was built with 14 gauge load bearing structural studs with double 5/8 type x drywall. The ceiling consisted of 16 gauge structural channels with double 5/8” type x sheetrock and a 2” concrete roof.
Project Facts
Construction of a mezzanine for an electrical control room.
- Building Addition
- Design-Build
- Electrical Construction
- Fire Alarm
- HVAC
- Lighting Project
- Power Distribution Upgrade
- Renovation